金年会

ESG

Responsibility

Safety and EP

Yangzi Xinfu photovoltaic power generation project officially put into operation

2014-08-20 views 484

After one year of intensive construction, the photovoltaic power generation project of Jiangsu Yangzi Xinfu Shipbuilding Co., Ltd. has been connected to the grid and put into operation on August 19th, 2014.


The total installed capacity of the photovoltaic system of the project is 8.9 MW, which is expected to provide about 10 million KWH of preferential electricity for Yangzi Xinfu every year and save about 1.6 million yuan of electricity. During the construction period, leaders at all levels of the company attach great importance to it, and the equipment management department assigns special personnel for tracing and coordination. The whole project did not affect the company's production due to construction, and no safety accidents occurred. The power distribution room, cable trench and other facilities did not occupy the production site, and coordinated with the original appearance of the factory, so that the project passed the one-time acceptance and successfully put into operation.



XML 地图